File #: 25-1540    Name:
Type: Consent Item Status: Agenda Ready
File created: 11/6/2025 In control: City Council
On agenda: 11/18/2025 Final action:
Title: APPROVE FUNDING AGREEMENT (#9200000000M550721) WITH THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (METRO) FOR THE REDONDO BEACH ADVANCED TRAFFIC SIGNAL SYSTEM (RBATS) DESIGN PROJECT, NO. 41430
Attachments: 1. Administrative Report, 2. AGMT- Agreement with LA Metro
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

To:                                                               MAYOR AND CITY COUNCIL

From:                                                               ANDREW WINJE, PUBLIC WORKS DIRECTOR

 

TITLE

title    

APPROVE FUNDING AGREEMENT (#9200000000M550721) WITH THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (METRO) FOR THE REDONDO BEACH ADVANCED TRAFFIC SIGNAL SYSTEM (RBATS) DESIGN PROJECT, NO. 41430

end

 

EXECUTIVE SUMMARY

The Los Angeles County Metropolitan Transportation Authority (Metro) Board approved funding for traffic signal modification design plans to help continue the South Bay’s Advanced Signal Network.  The purpose is to install current technology infrastructure to enable enhanced signal timing, allow traffic signals to respond to on-demand traffic conditions, and prepare traffic signals for connected vehicles.  It also includes designing the portion of fiber backbone infrastructure along Artesia Boulevard and the connection to the Los Angeles County fiber network hub near Artesia and Hawthorne Boulevards.  The current approved funding and scope for this Agreement covers the development of design documents for the Artesia Boulevard corridor, using $160,000 of Regional Measure M funds allocated to the City of Redondo Beach. 

 

BACKGROUND

The Redondo Beach Advanced Traffic Signal Network (RBATS) project is a continuation of the Manhattan Beach Advanced Traffic Signal Network (MBATS), which is currently under construction and includes fiber infrastructure along Artesia Boulevard in Redondo Beach.  The RBATS project will install state of the art signal infrastructure so that signal timing and operations can be integrated into a broadband network maintained by Los Angeles County.  Traffic signals along Artesia Boulevard are co-maintained by the Los Angeles County Department of Public Works and the City’s Public Works Department. 

 

The funding will include necessary upgrades at traffic signals along Artesia Boulevard that did not receive upgrades through prior projects, along with intelligent transportation systems components, ADA upgrades, and improved pedestrian push buttons.  The project will allow for enhanced and responsive signal timing.  The fiber backbone infrastructure will connect with the Los Angeles County fiber network hub near Artesia and Hawthorne Boulevards. 

 

Metro prepared a funding agreement for $160,000 that covers the design development (plans, specifications, and estimates) for this project.  Approval of the proposed Funding Agreement is needed so the City can be reimbursed for the completion of this work. 

 

COORDINATION

This report was prepared by the Public Works Department.  The City Attorney’s Office approved the Funding Agreement as to form. 

 

FISCAL IMPACT

The total allocation of Regional Measure M funds to the City is $160,000 and is appropriated to Project No. 41430.  The funding does not require a local match.  Funds are paid to the City on a cost-reimbursement basis after the work is performed. 


APPROVED BY:

Mike Witzansky, City Manager

ATTACHMENTS

                     Agmt - Funding Agreement #9200000000M550721 with the Los Angeles County Metropolitan Transportation Authority