File #: PC24-1226    Name:
Type: Public Hearing Status: Agenda Ready
File created: 7/11/2024 In control: Planning Commission
On agenda: 7/18/2024 Final action:
Title: Public Hearing for consideration of an Exemption Declaration and Conditional Use Permit to allow the installation and operation of a wireless telecommunication facility on an existing Southern California Edison Transmission Tower on property located at 2504 Manhattan Beach Boulevard in the Public Right-of-Way (P-ROW) zone. RECOMMENDATION: 1. Open the public hearing, administer oath, take testimony from staff, the applicant and other interested parties, and deliberate; 2. Close the public hearing; and 3. Adopt the attached resolution by title only, waiving further reading: A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF REDONDO BEACH ADOPTING AN EXEMPTION DECLARATION AND APPROVING THE REQUEST FOR A CONDITIONAL USE PERMIT TO ALLOW THE INSTALLATION AND OPERATION OF A WIRELESS TELECOMMUNICATION FACILITY ON AN EXISTING SOUTHERN CALIFORNIA EDISON TRANSMISSION TOWER ON PROPERTY LOCATED AT 2504 MANHATTAN BEACH BOULEVARD IN THE PUBLIC RIGHT-OF-WAY (P-ROW) ZONE (CASE NO. CUP-2024-05).
Attachments: 1. Administrative Report, 2. Attachment 1 - 2504 Manhattan Beach Boulevard - Exemption Declaration.pdf, 3. Attachment 2 - 2504 Manhattan Beach Boulevard - Draft Resolution (1).pdf, 4. Attachment 3 - 2504 Manhattan Beach Boulevard - CUP Application.pdf, 5. Attachment 4 - 2504 Manhattan Beach Boulevard - Plans.pdf, 6. Attachment 5 - 2504 Manhattan Beach Boulevard - Photo-simulations.pdf, 7. Attachment 6 - 2504 Manhattan Beach Boulevard - Coverage Maps.pdf, 8. Attachment 7 - 2504 Manhattan Beach Boulevard - Radio Frequency Report.pdf
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
To: PLANNING COMMISSION
From: VICTORIA BANFIELD, ASSOCIATE PLANNER

TITLE
title
Public Hearing for consideration of an Exemption Declaration and Conditional Use Permit to allow the installation and operation of a wireless telecommunication facility on an existing Southern California Edison Transmission Tower on property located at 2504 Manhattan Beach Boulevard in the Public Right-of-Way (P-ROW) zone.

RECOMMENDATION:
1. Open the public hearing, administer oath, take testimony from staff, the applicant and other interested parties, and deliberate;
2. Close the public hearing; and
3. Adopt the attached resolution by title only, waiving further reading:

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF REDONDO BEACH ADOPTING AN EXEMPTION DECLARATION AND APPROVING THE REQUEST FOR A CONDITIONAL USE PERMIT TO ALLOW THE INSTALLATION AND OPERATION OF A WIRELESS TELECOMMUNICATION FACILITY ON AN EXISTING SOUTHERN CALIFORNIA EDISON TRANSMISSION TOWER ON PROPERTY LOCATED AT 2504 MANHATTAN BEACH BOULEVARD IN THE PUBLIC RIGHT-OF-WAY (P-ROW) ZONE (CASE NO. CUP-2024-05).
end

EXECUTIVE SUMMARY
The applicant is requesting approval of a Conditional Use Permit to allow the installation and operation of a wireless telecommunication facility on an existing Southern California Edison (SCE) Transmission Tower located in an SCE easement between Manhattan Beach Boulevard and Beland Boulevard. Per RBMC ?10-2.1110 and ?10-2.1614, new public utility facilities require approval of a Conditional Use Permit.

The proposed unmanned wireless telecommunications facility includes nine antennas arranged into three sectors, with six radio receiving units (RRU's), two per sector, to be mounted at a maximum height of 65 feet on an existing SCE Transmission Tower (painted to match the Tower), with associate equipment located within an 11'-6" tall, 215 square-foot CMU wall equipment enclosure with terracotta tile roof located within the footprint base of the Tower. The equipment structu...