City Logo
File #: 23-6706    Name:
Type: Consent Item Status: Agenda Ready
File created: 8/28/2023 In control: City Council
On agenda: 9/19/2023 Final action:
Title: APPROVE AN AGREEMENT WITH SOUTH COAST PAINTING, INC. TO REPAINT THE DECORATIVE METAL SAIL STRUCTURES ON THE PIER FOR A COST NOT TO EXCEED $129,088, INCLUDING A 15% CONTINGENCY, UTILIZING $92,773 OF DEDICATED CAPITAL IMPROVEMENT PROJECT FUNDS AND $36,315 OF SURPLUS HARBOR TIDELANDS FUNDS AVAILABLE IN THE HARBOR DREDGING PROJECT ACCOUNT ADOPT BY TITLE ONLY RESOLUTION NO. CC-2309-092, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, APPROPRIATING $36,315 FROM THE HARBOR DREDGING PROJECT TO THE PIER DECORATIVE SCULPTURE SAILS PAINTING PROJECT
Attachments: 1. Administrative Report, 2. Agreement - Pier Sails Repaint, 3. Insurance - South Coast Painting, 4. 2309-092 Reso - Pier Sails 091923, 5. Photos - Pier Sails
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
To: MAYOR AND CITY COUNCIL
From: TED SEMAAN, PUBLIC WORKS DIRECTOR

TITLE
title
APPROVE AN AGREEMENT WITH SOUTH COAST PAINTING, INC. TO REPAINT THE DECORATIVE METAL SAIL STRUCTURES ON THE PIER FOR A COST NOT TO EXCEED $129,088, INCLUDING A 15% CONTINGENCY, UTILIZING $92,773 OF DEDICATED CAPITAL IMPROVEMENT PROJECT FUNDS AND $36,315 OF SURPLUS HARBOR TIDELANDS FUNDS AVAILABLE IN THE HARBOR DREDGING PROJECT ACCOUNT

ADOPT BY TITLE ONLY RESOLUTION NO. CC-2309-092, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, APPROPRIATING $36,315 FROM THE HARBOR DREDGING PROJECT TO THE PIER DECORATIVE SCULPTURE SAILS PAINTING PROJECT
end

EXECUTIVE SUMMARY
Approval of this item would award an agreement to South Coast Painting, Inc. (South Coast Painting) to repaint the ten decorative sail structures on the Pier and appropriate necessary funds from the surplus balance in the Harbor Dredging Project. The sails were last painted in 2008 and need to be rehabilitated. South Coast Painting will perform the necessary work for a cost not to exceed $129,088, including a 15% contingency.

BACKGROUND
The Redondo Beach Pier contains ten decorative sail structures that are an iconic feature of the King Harbor area. The sails were installed approximately 30 years ago. Due to constant exposure to costal elements and sea air, the sails require repainting approximately every 15 years. The most recent repainting was done in 2008, and photos showing the current condition of the sails are attached to this report.

South Coast Painting of Rancho Palos Verdes has submitted a proposal to provide all materials, equipment, labor, and expertise to repaint the sails, which includes the following:
- Pressure washing all surfaces to remove loose dirt, rust, and failing product
- Scraping, sanding, and degreasing of all metal surfaces
- Spot priming rusted areas with epoxy primer
- Applying a finish coat of two-part semi-gloss epoxy

The cost for these service...