File #: 20-0919    Name:
Type: Consent Item Status: Agenda Ready
File created: 5/12/2020 In control: City Council
On agenda: 5/19/2020 Final action:
Title: ACCEPT AS COMPLETE THE MAIN LIBRARY ELEVATOR REHAB PROJECT, JOB NO. 20780, AND AUTHORIZE THE CITY ENGINEER TO FILE A NOTICE OF COMPLETION WITH THE LOS ANGELES COUNTY RECORDER
Attachments: 1. Administrative Report
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

To: MAYOR AND CITY COUNCIL
From: TED SEMAAN, PUBLIC WORKS DIRECTOR

TITLE
title
ACCEPT AS COMPLETE THE MAIN LIBRARY ELEVATOR REHAB PROJECT, JOB NO. 20780, AND AUTHORIZE THE CITY ENGINEER TO FILE A NOTICE OF COMPLETION WITH THE LOS ANGELES COUNTY RECORDER
end

EXECUTIVE SUMMARY
On September 3, 2019, the City Council approved an agreement with Specialized Elevator Services, LLC for the purchase of materials and labor for the Main Library Rehabilitation Project, Job No. 20780 for the amount of $173,784. The project is now complete and ready for City Council acceptance.

BACKGROUND
The elevator that serves the five levels of the Main Library and the Civic Center parking structure needed rehabilitation. The structure is almost 25 years old and experienced extremely heavy use by visitors to the Library and Civic Center as well as City employees. The elevator showed signs of wear in multiple areas and has had a number of breakdowns in recent years.

In 2015, the City performed repairs under a two-phased project approach. Phase I of the elevator renovation project included removal and replacement of the plunger assembly, removal and replacement of the jack casing, removal of portions of the concrete pit floor, replacement of hydraulic oil, and installation of a new above-ground feed line in an effort to alleviate operational problems.

On September 3, 2019, the City Council approved an agreement with Specialized Elevator Services, LLC for the purchase of materials and labor for the Main Library Rehabilitation Project, Job No. 20780 in the amount of $173,784. This second phase replaced outdated components such as the microprocessor controller, electrical switches, motor, pumps, and valves, and installed updated hoistway, pit, and door equipment and interior fixtures to modernize the elevator and alleviate recent concerns with its operation. An additional purchase order will be issued to an as yet undetermined contractor to repair floor tiles in the elevat...